8 Days Lemosho Route Kilimanjaro Trek for US$1899/Person, Based on 2 - 3 People

Join a Group,
See Available Dates Below:

June 01 – June 08, 2021
June 21 – June 28, 2021
July 11 – July 18, 2021
July 23 – July 30, 2021
August 05 – August 12, 2021
August 22 – August 29, 2021
September 01 – September 08, 2021
September 22 – September 29, 2021
October 02 – October 09, 2021
October 23 – October 30, 2021
November 02 – November 09, 2021
November 10 – November 17, 2021
November 22 – November 29, 2021
December 02 – December 09, 2021
December 17 – December 24, 2021

 


Tour Itinerary:

Day 1: Lemosho Gate to Mti Mkumbwa (2,650 m/8,692 ft)
Hike time: 3hrs
Elevation Change: + 650 M/+2,132
Estimation distance: 10 km
Final Elevation: 2,650 m/8,694 ft
After a 1 1/2 hour drive from Moshi check in is at the Lemosho Gate. Day 1 is fairly easy with a 3/4 hour climb to Miti Mkubwa Camp.

Day 2: Mti Mkubwa (2,650 m/8,692 ft) to Shira One Camp (3,609 m/11,841 ft.)
Hike time: 5 – 6 hrs
Elevation change: + 950 M/+3116
Estimation distance: 12 km
Final Elevation: 3609 m/11,841 ft
A few hours walk will see the end of the forest and the beginning of a climb through heather forest to the edge of the Shira Caldera. Destination is the scenic Shira One Camp
 

Day 3: Shira One Camp (3,609 m/11,841 ft.) to Shira Two Camp (3,849 m/12,628 ft.)
Hike time: 5 - 6 hrs
Elevation change: + 240 M/+787 ft
Elevation distance: 5 km
Final elevation: 3849 m/12,628 ft.
Today is spent on a gentle hike across the Shira Plateau with possible side trips to Shira Cathedral. Camp is at the first high camp of Shira Two.

NOTE: From Shira Two Camp the trail links with Machame Route.
 

Day 4: Shira Two Camp (3,849 m/12,628 ft.) to Barranco Hut (3,948 m/12,956 ft.)
Hike time: 5 hrs
Elevation change: +100 M/+328 ft
Estimated distance: 6 km
Final elevation: 3948 m/12,956 ft.
The real work of climbing Kilimanjaro begins here. Today the main feature is a slow climb to Lava Camp followed by a descent to the beautiful Barranco Camp. This is the Climb-High-Sleep-Low principal of altitude adjustment.
 

Day 5: Barranco Hut (3,900 m/12,800 ft) to Karanga Valley (3,963 m/13,000 ft)
Hike time: 3.5 hrs
Elevation change: +100 m/+328 ft
Estimated distance: 4km/2.5 miles
Final elevation: 3,963 m/13,000 ft
After a climb of the Great Barranco Wall we continue around the southern ciruit train until we reach another sceneic location of Karanga Camp.
 

Day 6: Karanga Valley (3,963 m/13,000 ft) to Barafu Hut (4,600 m/15,091 ft)
Hike time: 3.5 hrs
Elevation change: +600 m/+1,968 ft
Estimated distance: 4km/2.5 miles
Final elevation: 4,600 m/15,091 ft
The trail from Karanga to Barafu reaches the bleak high desert of Kilimanjaro. Barafu Camp is a basic camp geared towards the business of reaching the summit.
 

Day 7: Barafu Camp (4,600m/15,091 ft) to The Summit (5,896 m/19,343 ft) and then to Mweka Camp (3,100 m/10,170 ft)
Summit time: 7 hrs
Elevation change: +1,300 m/+4,265 ft
Estimated distance: 5km/3.2 miles
Final elevation: 5,896 m/19,343 ft
Descent time: 5 hrs
Elevation change: -2,800 m/-9,186 ft
Estimated distance: 12km/7.5 miles
Final elevation: 3,100 m, 10,170 ft
This is a midnight ‘Alpine Summit’ to make sure we reach the summit by dawn, in time to return to Mweka Camp for the sake of improved
 

Day 8: Mweka Hut (3,100 m/10,170 ft) to Mweka Gate (1,828 m/6,000 ft)
Descent time: 4 hrs
Elevation change: -1,250 m/-4,101 ft
Estimated distance: 10km/6.21
Final elevation: 1,828 m/6,000 ft
Today is a short walk towards Mweka Gate and pickup. It is a short day with arrival at the Gate at about 12:00 noon. checkout and return to Moshi town.


Included in the price:

  • -- 2 Airport Transfers, from/to JRO Kilimanjaro Airport
  • -- 2 nights Hotel Lodging at Keys Hotel in Moshi town on Bed and Breakfast basis, Double or Triple Occupancy
  • -- 3 Delicious meals a days, boiled and filtered drinking water while on the mountain.
  • -- All park entrance, camping and rescue fees
  • -- All camping equipment, including sleeping tents, mess tent, mattresses, kitchen tent, staff tents and all cooking utensils
  • -- Warm water for washing to be provided every morning and evening.
  • -- Oxygen Cylinder - only for emergency
  • -- English Speaking Guides (Wilderness First Responder certified), cook and porters
  • -- Staff salaries and fees.
  • -- Transport to/from national park gates.
  • -- First aid kit and pulse oximeter.
  • -- Emergency telephone between the guides and our office in Moshi town.
  • -- 3 litres of bottled drinking water to be provided on the first day your hike, on the mountain porters will fetch water from the streams to be boiled and filtered for you..
     

Not included in the price:

  • -- Prices do not include sleeping bags
  • -- Gratuities
  • -- Soda/alcohol unless otherwise noted
  • -- Health insurance
  • -- Visa fees
  • -- International airfare
  • -- Laundry
  • -- All Meals and drinks in Moshi town

Kindly CONTACT US if you want to book the above tour.